Arkose Environmental
has the capabilities to perform assessments in
accordance with the U.S. Department of Housing and Urban Development
(HUD)
Multifamily Accelerated Processing
guidelines. Some of the HUD
specific environmental concerns include:
-
Operating oil and gas wells within 300 feet of existing construction or 75 feet of new construction
-
High pressure gas or petroleum lines within 10 feet of the property
-
Excessive hazards from smoke, fumes, offensive noises or odors
-
Construction in a flood hazard area
-
Stationary storage tanks with more than 100 gallons of flammable or explosive material
-
Wetlands
-
Airports
-
Lead-based paint
-
Asbestos
-
Radon
-
Lead in drinking water